|
Who's Online
There currently are 5675 guests online.
|
Categories
|
Information
|
Featured Product
|
|
|
|
|
There are currently no product reviews.
;
I found this manual to be complete in every detail. Besides the schematic it has a complete set of alignment instructions which are easy to understand. It also includes a complete parts list as well as an explanation of how the power supply and safety shutdown circuits operate. Even a schematic of the tuner is included.
;
The product was good and just what I needed, however I had moderate difficulty with the down load because the sight would not recognize my pass word. I was finally given a direct link to the manual and that worked.
;
Very quick and easy website to use and fast download of manual, quality of manual is excellent and will be pleased to use this service again in the future, thanks so much!
;
It is an very good and clear scanned service manual.
very recommended.
;
Easy to order the manual. Good quality and fast delivery.
X-NM1, XR-NM1
7 CD MECHA-2
CD Tray Open (Gear Load Aat the lower left of amechanism is turned to the left.)
Remove to the CLAMPER
A finger is put into the bottom of CHASSIS and CLAMPER is pushed from the bottom. The end of CLAMPER is united with the cut in right and left of CHASSIS, and the upper surface of CLAMPER is raised by hand and turned counterclockwise.
7 DIAGNOSIS OF CD MECHA ASSY
When diagnosing the CD MECHA Assy, use the following Flexible Cable and Connector Assys for service. Motor Assy - CD PWB Assy ( 6 pin Flexible Cable) : No. GGD1275
1
When removing a tray, a stopper is raised upwards and a tray is pulled.
2
A tray is attached, and a tray is put in at the time, making it move to the right for a while so that a cam slider may be gone into the slot on the tray. Control Assy - CD PWB ASSY 27P Flexible Cable : No. GGD1237
60
|
|
|
> |
|