There are currently no product reviews.
;
OEM manual provided all schematics, board layouts and component specs necessary to facilitate unit maintenance. All pages were clear and readable.
;
Good condition and quality. Hard to find anywhere in Internet, only on this site.
;
Exactly what I needed to be able to bring the amp back to life... will come back to this site the next time I need schematics.
;
Information was accurate and very helpful.
However the continuity made it a little difficult to follow from one page to the next.
;
Very very good as usual very trustable site. Perfect!!!!!!
CX-954
2. The right and left load levers move toward the front part of the mechanical module, to release the locking of the load cam, at the front and rear ends of the levers, with the four shafts of the CRG chassis unit and the shaft of the clamp arm. The right front section of the load cam turns the clamp switch ON, completing the clamp operation.
A shaft (CRG) locked with the cam A shaft (clamp arm) locked with the cam A shaft (CRG) locked with the cam Shafts (CRG) locked with the cam
2.4 Disk eject operation
1. When the loading motor turns in reverse, the disk eject operation begins. 2. The ejection of a 12 cm disk is completed when the SW3 turns OFF, then ON, and then OFF again. 3. The ejection of an 8 cm disk is completed when the SW2 turns OFF, then ON, and then OFF again.
18
|