There are currently no product reviews.
;
Excellent manual, complete, great resolution, easy to read especially the schematics. Thank you !
;
Fast delivery, excellent resolution and complete. And above all, the best price ever !
;
Vielen Dank,
das war eine prima Sache. Habe das Serviceheft nach 3 Stunden herunterladen können. Qualität OK. Hat mir mit Erfolg bei der Fehlersuche und Reparatur meines
Nordmende Galaxy Mesa 9000 geholfen. Ich kann diesen Service bestens weiterempfehlen
A very good service.
Thank You!
;
everything i needed. it was easy to get. and this site is now my go to site for manuals.
;
Quality as promised it arrived fast. No problems what so ever
CX-954
2. The right and left load levers move toward the front part of the mechanical module, to release the locking of the load cam, at the front and rear ends of the levers, with the four shafts of the CRG chassis unit and the shaft of the clamp arm. The right front section of the load cam turns the clamp switch ON, completing the clamp operation.
A shaft (CRG) locked with the cam A shaft (clamp arm) locked with the cam A shaft (CRG) locked with the cam Shafts (CRG) locked with the cam
2.4 Disk eject operation
1. When the loading motor turns in reverse, the disk eject operation begins. 2. The ejection of a 12 cm disk is completed when the SW3 turns OFF, then ON, and then OFF again. 3. The ejection of an 8 cm disk is completed when the SW2 turns OFF, then ON, and then OFF again.
18
|