|
Who's Online
There currently are 5991 guests online.
|
Categories
|
Information
|
Featured Product
|
|
|
|
|
There are currently no product reviews.
;
This is a good quality scan of the Operation & Maintenance (Service) Manual for the PAL version of this high-band broadcast umatic, BVU-800P
All schematics and lineup procedures appear to be included in this one manual AFAICT.
The file size is just over 113 MB which gives an idea of the quality and number of pages.
All of the schematics, which contain some fairly small print, are easily readable when you zoom into the page.
John Thompson, Newcastle Upon Tyne, England.
;
Good quality, all schematics of few of models. There is also short form of user manual and regulation manual.
;
Perfect copy of the service manual. you can enlarge every page, and it comes up
with all details.
;
It´s very very nice manual with all, what i need. Original in good quality. Very fast business. Very much thanks...
;
Purchased the manual that I was looking for at a great price and could download it easily.. Great service experience and for future purchases I plan to use the site.
Thank you very much
5
6
7
8
GENERAL INFORMATION
DIAGNOSIS
DISASSEMBLY
A
- Handling the mechanical module
1. The mechanical module should be handled by holding the upper frame and main frame of the mechanical module. 2. The front section of the upper frame is not very sturdy, so this section should not be held too firmly (see fig.1).
B
Do not hold onto this area.
Fig.1
- Removing the DVD Core Unit R
1. Bring the mechanism to a locked position (disk load standby position). 2. Turn the mechanical module upside down. 3. Set the pick-up flexible cable to a shorted position on the land end (the other is auxiliary), and turn the SW knob in the direction opposite to OP (see fig.2). 4. Remove the pick-up flexible cable and the CRG flexible cable from the connector. Remove the solder on the lead wires of the load motor. 5. Remove screws at two locations, and remove the DVD Core Unit R (lift the board in the direction of the white arrow shown in fig.3, and remove it out diagonally).
Auxiliary land
Short
C
Fig.2
DVD Core Unit R
D
Fig.3
Main shaft clamp spring PU rack - Removing the PU unit (see fig.4)
1. Lift the pick-up rack to the center of the axis of the rack, turn it 90 degrees first, then press on it lightly, and fix it in place temporarily. 2. Remove the screw that keeps the main shaft clamp spring in place, and remove the main shaft clamp spring. 3. Remove the PU unit with the main shaft attached.
PU unit Main shaft
E
CRG motor
Fig.4
F
AVIC-880DVD/UC
5 6
7
8
33
|
|
|
> |
|